Canadian ReviewsCanadian Reviews
  • What’s On
  • Reviews
  • Digital World
  • Lifestyle
  • Travel
  • Trending
  • Web Stories
Trending Now
‘The Empress’ Season 3 Sets Release Date Window on Netflix

‘The Empress’ Season 3 Sets Release Date Window on Netflix

The entry-level Samsung Galaxy Buds FE are on sale for  off

The entry-level Samsung Galaxy Buds FE are on sale for $30 off

AI and Automation Reshape Hotel Operations as Industry Prepares for 2026

AI and Automation Reshape Hotel Operations as Industry Prepares for 2026

This superhero game takes the right inspiration from movies and TV

This superhero game takes the right inspiration from movies and TV

Your daily horoscope: January 29, 2026 | Canada Voices

Your daily horoscope: January 29, 2026 | Canada Voices

Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production

Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production

'80s Thrash Metal Band Celebrates 42nd Anniversary of Iconic Album

'80s Thrash Metal Band Celebrates 42nd Anniversary of Iconic Album

Facebook X (Twitter) Instagram
  • Privacy
  • Terms
  • Advertise
  • Contact us
Facebook X (Twitter) Instagram Pinterest Vimeo
Canadian ReviewsCanadian Reviews
  • What’s On
  • Reviews
  • Digital World
  • Lifestyle
  • Travel
  • Trending
  • Web Stories
Newsletter
Canadian ReviewsCanadian Reviews
You are at:Home » Case Study: Hotel Opening Purchasing & Installation
Case Study: Hotel Opening Purchasing & Installation
Travel

Case Study: Hotel Opening Purchasing & Installation

28 January 20263 Mins Read

  • How to Avoid Common FF&E Scheduling Pitfalls During a Hotel Renovation- By Charis Atwood – Image Credit Pexels   

A developer engaged a project management (PM) team and a large, reputable procurement firm for a high-end, dual-property coastal hotel development in California. As the opening date approached, it became clear that while construction was progressing, the status of the FF&E (Furniture, Fixtures and Equipment) was largely unknown. 

The opening deadline was approaching and potential failed inspections were on the horizon. Key FF&E components were unaccounted for and extended delays loomed on the horizon.

As an FF&E Consultant, we were brought in to locate the missing pieces and create a recovery plan and get the project back on track. 

Analysis: Hotel Procurement vs Construction

The PM team focused on building and site completion but lacked visibility into FF&E readiness. Meanwhile, the procurement team issued orders and expediting reports but had not been given critical construction milestones – most notably electrical inspection dates requiring installation of hardwire decorative lighting. 

  • Unclear Roles and Expectations:

The PM team assumed the procurement firm had access to critical project dates, while the procurement firm was never provided with schedules and did not proactively request them. Vendor site questions were relayed but not escalated with urgency. No red flags were raised until the projected neared opening. 

  • Purchasing vs. Installation Responsibilities:

The procurement firm’s scope covered the basics of purchasing, not onsite coordination, or installation. This distinction was not clearly communicated, leading the PM team and owner to assume responsibilities that were never formally assigned. 

Results: Hotel Inspections and Opening Timeline

Both properties passed inspections and opened on time.

To achieve this, as the FF&E Consultants, we were able to:

  1. Conduct a comprehensive assessment of FF&E status across all areas – guestrooms, public spaces, F&B venues, ballrooms, and pools – by reviewing expediting reports against the construction schedule and identifying items not yet ordered. 
  2. Flag items that would miss key milestones and implement temporary or alternative solutions to maintain progress. 
  3. Coordinated installation schedules, worked directly with installation teams, assisted with space punch walks, and adjusted plans in real time – while preserving the original opening date. 

A coordinated recovery effort that protected the owner’s investment and delivered two on-time hotel openings despite late-stage challenges.

Charis Atwood

Charis Atwood is an expert in project management, from project programming, budgeting, scheduling, managing RFP’s, quality control, and installation to operational turnover and opening. She is an invaluable asset to all projects she manages. Charis focuses on FF&E (Furniture, Fixtures & Equipment) and works closely with owners, purchasing agents, vendors, and interior designers to coordinate budget requirements and to assure deadlines are maintained. This includes but is not limited to, thorough reviews of architectural drawings to ensure interior design elements are represented as required, bid and contract negotiations for purchasing, warehousing, and installation of FF&E. She has been instrumental in the FF&E/OS&E Management of many timely and budget-driven projects such as resorts, hotels, casinos, country clubs and schools. She is an active member of Cayuga Hospitality Consultants.

This article originally appeared on Cayuga Hospitality Consultants.

Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email

Related Articles

AI and Automation Reshape Hotel Operations as Industry Prepares for 2026

AI and Automation Reshape Hotel Operations as Industry Prepares for 2026

Travel 29 January 2026
Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production

Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production

Travel 29 January 2026
Majority of 2026 Travelers Plan Trips Around Life Milestones, Survey Finds

Majority of 2026 Travelers Plan Trips Around Life Milestones, Survey Finds

Travel 28 January 2026
Hilton, Hyatt, and IHG Announce Free Human Trafficking Prevention Training for Hospitality Industry

Hilton, Hyatt, and IHG Announce Free Human Trafficking Prevention Training for Hospitality Industry

Travel 28 January 2026
Curator Hotel & Resort Collection Adds Five Inns of Monterey Properties in California

Curator Hotel & Resort Collection Adds Five Inns of Monterey Properties in California

Travel 28 January 2026
Oracle to Help Improve Construction Visibility and Results for Red Sea Global

Oracle to Help Improve Construction Visibility and Results for Red Sea Global

Travel 28 January 2026
Top Articles
As an ER doc and a mom. Here are five things I don’t let my kids do because the risks are too high | Canada Voices

As an ER doc and a mom. Here are five things I don’t let my kids do because the risks are too high | Canada Voices

11 January 2026242 Views
Old family photos collecting dust? Here’s how to get rid of them without letting go of the memories | Canada Voices

Old family photos collecting dust? Here’s how to get rid of them without letting go of the memories | Canada Voices

27 December 2025191 Views
Anyone want to buy a car that drives itself? Canada reviews

Anyone want to buy a car that drives itself? Canada reviews

3 December 2025120 Views
These BookTok influencers are finding success in turning reading into a game | Canada Voices

These BookTok influencers are finding success in turning reading into a game | Canada Voices

27 December 2025113 Views
Demo
Don't Miss
Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production
Travel 29 January 2026

Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production

Case Study: How a GDN Campaign Tripled a Luxury Hotel’s Breakfast Package Production – By…

'80s Thrash Metal Band Celebrates 42nd Anniversary of Iconic Album

'80s Thrash Metal Band Celebrates 42nd Anniversary of Iconic Album

Tesla says production-ready Optimus robot is coming soon

Tesla says production-ready Optimus robot is coming soon

Netflix Germany Unveils 2026 Slate of Movies, Series and Documentaries

Netflix Germany Unveils 2026 Slate of Movies, Series and Documentaries

About Us
About Us

Canadian Reviews is your one-stop website for the latest Canadian trends and things to do, follow us now to get the news that matters to you.

Facebook X (Twitter) Pinterest YouTube WhatsApp
Our Picks
‘The Empress’ Season 3 Sets Release Date Window on Netflix

‘The Empress’ Season 3 Sets Release Date Window on Netflix

The entry-level Samsung Galaxy Buds FE are on sale for  off

The entry-level Samsung Galaxy Buds FE are on sale for $30 off

AI and Automation Reshape Hotel Operations as Industry Prepares for 2026

AI and Automation Reshape Hotel Operations as Industry Prepares for 2026

Most Popular
Why You Should Consider Investing with IC Markets

Why You Should Consider Investing with IC Markets

28 April 202429 Views
OANDA Review – Low costs and no deposit requirements

OANDA Review – Low costs and no deposit requirements

28 April 2024360 Views
LearnToTrade: A Comprehensive Look at the Controversial Trading School

LearnToTrade: A Comprehensive Look at the Controversial Trading School

28 April 202469 Views
© 2026 ThemeSphere. Designed by ThemeSphere.
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact us

Type above and press Enter to search. Press Esc to cancel.